JOSKIN Polska (Poland) is expanding

  • Since March of this year, the JOSKIN Polska site has undergone a major development with the construction of a new storage hall with a floor area of over 12,000 m² and a volume of almost 100,000 m³

With this new building, the total area of the JOSKIN Polska site will be increased to 73,000 m². This site includes several welding lines, a galvanising plant, semi-automatic painting lines, assembly lines for some of our products (slurry tankers, muck spreaders, dropside tipping trailers, bale trailers and low loaders, spreading implements, silage trailers and livestock trailers) and a showroom. More than 350 people work there every day.

As part of the JOSKIN Group’s long-term development strategy, the 163 m long and 87 m wide building, which is scheduled for provisional acceptance in early 2023, will have one storey, four aisles, 13 doors and several overhead cranes. The main goal of this building will be to increase the existing storage capacity, but also to allow changes to the current organisation of the site. In particular, the high-bay warehouse of the assembly workshop, which is currently located in the existing buildings, will be moved there.

These moves will optimise internal transport, improve work organisation and centralise semi-finished products in one area. In total, about 40 people will be employed there. The hall will be ideally located between the assembly areas and the JOSKIN galvanising plant, so it can be supplied quickly and efficiently.

With the expansion of the JOSKIN Polska site, there will be more space in the existing buildings. The assembly lines will be expanded to take in new operators in order to increase the Group’s overall productivity.